For the Elsewedy Ben Ban site, LinkVue’s task was to integrate multi-layered security within one of Africa’s largest solar clusters. The surveillance grid covered vast areas using smart PTZ and fixed cameras with infrared capabilities. Intrusion detection lines were mapped along key perimeter zones.

Network segregation was applied between security and operational networks to ensure safety. Maintenance access control was digitized to track personnel movement. We also implemented remote alarm management to speed up response times. The system architecture allowed centralized viewing across multiple Ben Ban blocks.

Periodic training was conducted for local operators. This project enhanced the overall security efficiency for the entire Ben Ban complex.